What we’ve made
Guildhall School of Music and Drama
City of London School
Bullfinch Lane
Made Architects has been appointed for planning for 5 new family dwellings on an infill site in an established urban area of Kent.
City of London School for Girls
We are pleased to announce that the consortium of made Architects and NorthSouth Consultants has been appointed for Project Management and QS Services for the City of London School for Girl's 2024-2027 Refurbishment Masterplan Works.
NorthSouth Consultants, a leader in project management and consultancy, will oversee the implementation and execution of the programme. Their expertise in managing complex projects will be instrumental in ensuring that all work is completed efficiently and to the highest standards.
The Summer Works Programme aims to improve and modernise facilities at the school, providing an exceptional Learningal environment that supports the academic and personal growth of its students.
Redkiln
Made Architects has been appointed to provide architectural services for a warehouse project in Horsham with potentially exciting tenants in the life sciences sector.
UCL
Refurbishment of an office and meeting spaces in London. The project, will involve a full strip-out, updated floor and wall finishes, and comprehensive specification plans.
22 Soho Square
Full architectural scope for the recladding, refurbishment, and internal upgrades of an eight-storey mixed-use iconic building in London. The project includes commercial office space, penthouse residential apartments, and the addition of a rooftop terrace.
Port of Dover
Provision of new canopy over the vehicle lanes at the former boarding point of the cross channel hovercraft.
Basingstoke College of Technology
Appointed by ACS Professionals In Construction Ltd to provide technical design services for cladding remediation works at Basingstoke College of Technology.
Padel Courts
Royal Veterinary College
Worth Abbey
Made Architects has been appointed by Worth Abbey to enhance the welcome experience into their Abbey Church, along with it's supporting spaces. The scheme will include the development of the existing Welcome Centre in the Narthex, a new library space and refurbishment of the WC’s.
Paddock Wood
Reconfiguration project for the South East Coast Ambulance Service (SECamb) in Tonbridge. This transformative initiative will enhance operational efficiency, improve facilities for staff, and further support the emergency services that SECamb provides to the local community.
Data Aggregation Facility
Recently completed project delivering vital retrofitting and new build works for research and development facilities at an existing communications hub.
Chavecroft
Residential project which comprises of the design and delivery of five family dwellings and eighteen apartments with parking and external amenity in Epsom, Surrey.
Meath Epilepsy Charity
Made Architects has been appointed by Meath Epilepsy Charity to prepare a concept design and feasibility document for its Health and Wellbeing centre. The plans for expansion will include a wellbeing and activity space for multiple activities including yoga, a hydro-running pool, physio, meeting rooms as well as supporting spaces - all of which will be fully accessible from the car park for community use.
Salesian College
made Architects have been appointed by Salesian college to develop a new sports facility for their campus. The scheme is to be built with an innovative sprung structure and we are delighted to share a couple of early concept images.
Gretton Rectory School
Extension and refurbishment to enable the integration of a new form of entry per year, as well as other specialist spaces, dining and new library.
Ridgeview Wine Estate
RIBA Stage 1-6 concept design to construction delivery of alfresco dining facilities for the winery to extend their hospitality offering at the Sussex vineyard. Parity between exciting design, locally sourced materials and a Chelsea Flower Show Gold Medal Winner landscape designer brought the scheme to life.
Residential Development
Made Architects has created a proposal for the construction of 24 houses and 12 apartments. The proposal enables a mix of tenures, unit sizes and material / building styles, helping to create the new town centre extension. made aim to connect the wider future owners and occupants with the wider community, connecting through to local shops, retails and Public Houses, as well as other services and facilities. The development provides housing that meets the needs of present and future generations in locations that are consistent with Thanet policy.